A little guidance
How to count weekdays between dates
Separate Monday–Friday dates from Saturday–Sunday dates. Use a two-week example and see why public holidays need a separate check.
Two full weeks: 10 weekdays and 4 weekend days
We selected Monday 2 November through Monday 16 November 2026, with the end date excluded, then checked what happens when that Monday is included.

| Range | Total days | Weekdays | Weekend days |
|---|---|---|---|
| 2–16 November, end excluded | 14 | 10 | 4 |
| 2–16 November, both included | 15 | 11 | 4 |
Public holidays are included. These figures count weekdays, not a country-specific working calendar.
Repeat this example
- Set Start date to 2 November 2026 and End date to 16 November 2026.
- Leave Include end date off to see 14 total days, 10 weekdays and 4 weekend days.
- Enable the switch to include the final Monday. Weekdays becomes 11 while weekends stays at 4.
Check the result
The default result is exactly 2 weeks. Copy result also includes the note that public holidays are not excluded.
A common mistake
Treating weekdays as guaranteed working days can overstate availability. Subtract applicable holidays or leave separately.
Try the dates in Date SpanSources and credits
Actual Date Span sessions. Screenshots show the calculator using the stated dates. Tables match its displayed results; Copy result produces text rather than a file.
Set a two-week range
Choose Monday 2 November 2026 as Start date and Monday 16 November 2026 as End date. Leave Include end date off. This creates a 14-day range covering two full weeks.
Read weekdays and weekend days
Date Span shows 10 weekdays and 4 weekend days. These add up to the 14-day total. Weekdays always mean Monday through Friday in this calculator; Saturday and Sunday are weekend days.
Check the end date setting
Turn on Include end date and Monday 16 November also counts. The result becomes 15 days, with 11 weekdays and 4 weekend days. An included Saturday or Sunday increases the weekend count instead.
For more boundary examples, see inclusive and exclusive date ranges.
Account for your actual work calendar
Public holidays are included in the weekday count. If a holiday, leave day or different weekly schedule applies, adjust the result separately using the calendar that applies to your team. The calculator does not select countries or holiday rules.
Keep the context when sharing