How to count weekdays between dates

Separate Monday–Friday dates from Saturday–Sunday dates. Use a two-week example and see why public holidays need a separate check.

Advertisements

Open Date Span

Two full weeks: 10 weekdays and 4 weekend days

We selected Monday 2 November through Monday 16 November 2026, with the end date excluded, then checked what happens when that Monday is included.

Date Span showing 2 to 16 November 2026: 14 days, 2 weeks, 10 weekdays and 4 weekend days.
Two complete weeks contain ten Monday–Friday dates and four Saturday–Sunday dates. View full size
RangeTotal daysWeekdaysWeekend days
2–16 November, end excluded14104
2–16 November, both included15114

Public holidays are included. These figures count weekdays, not a country-specific working calendar.

Repeat this example

  1. Set Start date to 2 November 2026 and End date to 16 November 2026.
  2. Leave Include end date off to see 14 total days, 10 weekdays and 4 weekend days.
  3. Enable the switch to include the final Monday. Weekdays becomes 11 while weekends stays at 4.

Check the result

The default result is exactly 2 weeks. Copy result also includes the note that public holidays are not excluded.

A common mistake

Treating weekdays as guaranteed working days can overstate availability. Subtract applicable holidays or leave separately.

Try the dates in Date Span

Sources and credits

Actual Date Span sessions. Screenshots show the calculator using the stated dates. Tables match its displayed results; Copy result produces text rather than a file.

Set a two-week range

Choose Monday 2 November 2026 as Start date and Monday 16 November 2026 as End date. Leave Include end date off. This creates a 14-day range covering two full weeks.

Read weekdays and weekend days

Date Span shows 10 weekdays and 4 weekend days. These add up to the 14-day total. Weekdays always mean Monday through Friday in this calculator; Saturday and Sunday are weekend days.

Check the end date setting

Turn on Include end date and Monday 16 November also counts. The result becomes 15 days, with 11 weekdays and 4 weekend days. An included Saturday or Sunday increases the weekend count instead.

Account for your actual work calendar

Public holidays are included in the weekday count. If a holiday, leave day or different weekly schedule applies, adjust the result separately using the calendar that applies to your team. The calculator does not select countries or holiday rules.

Keep the context when sharing

Copy result includes the weekday definition and the public-holiday note. Keep those lines when sharing a schedule estimate so the recipient can see exactly what has been counted.